Demonstration dataset. Fictional parcel and infrastructure records. Not suitable for acquisition or engineering decisions.
Fixture mode — no live sources connectedSnapshot 2026-08-14Scoring dc-screening-balanced 0.1.0-demo18 demo sourcesData and methodology
EligibleShortlisted
Suitability
76/ 100
Promising
Build Confidence
43/ 100
Directional only
Why it ranks here
Derived from the calculation, not written by an assistant.
- Power asset proximity scores 83 of 100 and contributes 10.11 points.
- Mapped fibre route proximity scores 89 of 100 and contributes 5.35 points.
- No project-specific grid capacity or connection evidence is held. Power signals are proximity-based only.
- Network queue pressure scores 25 of 100 against this requirement.
- Relative land cost band scores 30 of 100 against this requirement.
Missing evidence 1
Each gap is recorded explicitly. None of them has been counted as a zero.
Grid capacity and connection offer
Raise a project-specific connection enquiry with the network operator for the indicative site load.
Group score 58.1Group weight 35%Evidence coverage 100%
Columns: value · normalised score · weight within group · factor confidence. Select any row to open its calculation and evidence.