Demonstration dataset. Fictional parcel and infrastructure records. Not suitable for acquisition or engineering decisions.
Suitability
70/ 100
Promising
Build Confidence
38/ 100
Insufficient
Why it ranks here
Derived from the calculation, not written by an assistant.
- Power asset proximity scores 98 of 100 and contributes 11.94 points.
- Indicative voltage fit scores 90 of 100 and contributes 6.30 points.
- No project-specific grid capacity or connection evidence is held. Power signals are proximity-based only.
- Major designation burden scores 15 of 100 against this requirement.
- Network queue pressure scores 25 of 100 against this requirement.
Missing evidence 5
Each gap is recorded explicitly. None of them has been counted as a zero.
Grid capacity and connection offer
Raise a project-specific connection enquiry with the network operator for the indicative site load.
Safeguarding designations
Check aerodrome, minerals and other safeguarding designations with the authority.
Title and ownership structure
Order the title register and plan, and review encumbrances.
Carrier service quotation
Request written quotations from at least two carriers for the parcel.
Number of distinct titles intersecting the parcel
Obtain a project-specific record for number of distinct titles intersecting the parcel.
Columns: value · normalised score · weight within group · factor confidence. Select any row to open its calculation and evidence.