Fixture mode — no live sources connectedSnapshot 2026-08-14Scoring dc-screening-balanced 0.1.0-demo18 demo sourcesData and methodology
EligibleWatching
Suitability
68/ 100
Promising
Build Confidence
42/ 100
Directional only
Why it ranks here
Derived from the calculation, not written by an assistant.
- Mapped fibre route proximity scores 91 of 100 and contributes 5.46 points.
- Route diversity proxy scores 90 of 100 and contributes 4.72 points.
- No project-specific grid capacity or connection evidence is held. Power signals are proximity-based only.
- Network queue pressure scores 25 of 100 against this requirement.
- Expansion adjacency scores 25 of 100 against this requirement.
Missing evidence 2
Each gap is recorded explicitly. None of them has been counted as a zero.
Grid capacity and connection offer
Raise a project-specific connection enquiry with the network operator for the indicative site load.
Heat offtaker
Identify and approach a credible heat offtaker before relying on heat reuse.
Group score 53.3Group weight 35%Evidence coverage 100%
Columns: value · normalised score · weight within group · factor confidence. Select any row to open its calculation and evidence.